Access, safety and compliance

Sharing COSHH information before a coating is approved

A folder of coating safety data sheets laid out beside sample tins on a site table.

Approving a coating for use inside a managed building usually means the facilities team wants to see what is actually in the tin before it arrives on site — not just a product name, but the safety data that lets them judge storage, ventilation and any occupied-building implications.

What we provide ahead of the job

Safety data sheets for the specific products proposed are supplied as part of the approval pack, alongside a plain-language summary of anything that affects an occupied building — strong odour, extended cure time, or the need for ventilation during and after application.

  • Safety data sheets supplied for every product proposed for use
  • Ventilation or extended cure needs flagged in plain language
  • Lower-odour or lower-solvent alternatives offered where suitable

Storage and quantities on site

Coatings and thinners are kept in the quantities actually needed for the day rather than a full site stock, reducing what is stored in an occupied building at any one time. Flammable items are kept away from ignition sources and out of general circulation areas.

Handling questions from building occupants

Where a coating has a noticeable odour, we would rather explain what it is and how long it will last than let occupants guess. A short written notice ahead of the work, referencing the product in plain terms, tends to prevent far more queries than it generates.

Questions we are asked about this

Can you supply safety data sheets before we approve the job?

Yes, we include them with the specification so your facilities team can review them alongside the quotation.

Do you offer lower-odour products for occupied buildings?

Where the performance requirement allows it, yes — we will discuss the trade-offs against durability and drying time rather than assuming lower odour is always the better choice.

How much coating do you keep on site during a job?

Generally only what is needed for the current phase of work, reducing the volume of flammable or solvent-based material stored in the building at any time.

A small daily stock of coating tins stored away from a busy office corridor.

Ask us for the safety data sheets on any product before you approve the specification.

COSHH information should reach the building manager before the coating reaches the building, not after.

Start your project

Planning a commercial painting or decorating project?

Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.