Access, safety and compliance

Working alongside a fixed scaffold on your building

Fixed tube and board scaffold wrapping the front elevation of a period townhouse being repainted.

Fixed scaffold is usually somebody else's kit, erected and struck by a specialist contractor, with decorating slotted in between. That means our programme depends on theirs, and the handover between trades needs to be managed properly rather than assumed.

The handover that matters

Before starting work on scaffold we have not erected ourselves, we walk it with whoever handed it over, checking boarding, ties and access points against what the elevation actually needs. Any gap — a missing board, a tie in the wrong place for our work — gets raised before paint goes anywhere near it.

  • Handover inspection carried out before work begins each time
  • Boarding checked against the specific tasks planned for that level
  • Any defect reported to the scaffold contractor rather than worked around

Sharing the programme with the scaffold hire period

Scaffold hire is charged by the week, so our sequencing tries to make efficient use of every level while it is up — working top-down where drying times allow, and flagging early if weather is going to extend the period scaffold needs to stay in place.

Sharing access with other trades

Where roofers, render repairers or window fitters are using the same scaffold, we agree a rota for each level so nobody is spraying past someone else's open window or working beneath falling debris. This gets set out before work starts, not negotiated daily on site.

Questions we are asked about this

Do you arrange the scaffold yourselves?

We can recommend and coordinate with a scaffold contractor, or work with one the client has already appointed — either way we inspect the handover before use.

What happens if scaffold needs to stay up longer than planned?

We flag this as early as possible so the client can discuss the extended hire cost with the scaffold contractor, and we adjust our own programme to make use of the extra time.

Can decorating and roofing happen on the same scaffold at once?

Sometimes, with a level-by-level rota agreed in advance. We avoid working directly below another trade generating debris or dust.

A decorator inspecting scaffold boarding and guard rails before beginning work on an upper level.

Send your scaffold contractor's programme and we will slot decorating in around it.

Scaffold coordination is about a proper handover check and a programme that respects the hire period.