Getting access written into the scope, not assumed

A scaffold tower positioned against a tall stairwell inside a period property.

Access is one of the most common sources of unplanned extra cost on a decorating contract, precisely because it is easy to leave unstated. A ladder, a tower and a scaffold represent very different costs and timescales, and a specification that does not say which is expected leaves that decision to whoever happens to price the job.

Questions we are asked about this

Who normally arranges scaffold for a house repaint?

This varies — sometimes the decorator arranges it as part of their price, sometimes the client instructs a scaffold company directly. Either way it should be agreed and stated before pricing.

Does access affect the programme as well as the price?

Yes, erecting and striking scaffold or towers takes time that should be built into the overall programme, not treated as instant once ordered.

What if access needs change once work starts?

This can happen where a substrate condition is worse than expected at height — the specification should include a simple process for agreeing any additional access equipment needed.

Naming the access method by area

Rather than a single generic access line for the whole job, a specification should note the expected method for each area — internal stepladders for standard ceiling heights, a tower for stairwells, scaffold or a MEWP for elevations beyond safe ladder reach — so pricing reflects the true equipment needed.

External scaffold erected along the elevation of a coastal apartment block.

Timing constraints that affect access

Shared driveways, restricted parking, working hours agreed with neighbours, and any requirement to remove access equipment overnight for security all affect how quickly access can be erected, used and struck, and should be stated rather than discovered on the first morning.

  • Parking and loading restrictions near the property
  • Agreed working hours affecting scaffold erection or MEWP use
  • Any requirement to secure or remove equipment overnight

Who provides and who scaffolds

State clearly whether the client is providing scaffold independently, whether the decorator is expected to arrange it, and who bears responsibility for scaffold licensing, pavement permissions or neighbour access agreements where relevant.

  • Confirmation of who arranges and pays for scaffold or towers
  • Responsibility for any pavement licence or road permit
  • Agreement on shared scaffold use if other trades need it too

Why this belongs in the specification, not the quote alone

Access assumptions buried only inside a contractor's quote are easy to miss when comparing tenders. Writing them into the specification itself means every tenderer responds to the same access requirement, and the client retains oversight of what has been assumed.

How we work on this

  • We name the access method expected for each area of a job before pricing
  • We confirm responsibility for scaffold, towers and permissions in writing
  • We factor erection and striking time into the programme, not just the cost

Tell us about the building's access constraints and we will specify the right equipment before quoting.

Access left unstated becomes an extra later; access specified up front becomes a known, comparable cost.