Working in occupied premises

Keeping IT equipment and stock safe during decoration

A single paint splash on a server rack or a dust-clogged fan can cost far more to put right than the decorating job itself. Protecting equipment and stock properly takes a few extra minutes per item, and skipping it is the single most avoidable cause of expensive damage on commercial jobs.

Server rack fully sheeted with sealed edges and cable entry points during nearby decorating work

Assessing what can move and what can't

Before any protection goes up, we walk the room with the site contact and agree which equipment we can relocate ourselves, which needs the client's own IT team to move, and which is fixed in place and has to be worked around and sheeted in situ. Guessing at this on the day is how expensive mistakes happen.

Retail shelving sheeted and taped ahead of a section of decorating work in a live store

Sheeting that actually seals

A loose sheet draped over a server rack looks protected but leaves gaps at every edge for dust and overspray to reach vents and ports. We use taped, fitted covers that seal at the base and around cable runs, and we check server room air intakes and extract points specifically, since these are the most vulnerable spots.

  • Vents, fans and cable entry points sealed individually, not just the unit as a whole
  • Equipment powered down where the client's IT team confirms it's safe to do so
  • Sheeting checked and re-taped at the start of each working session

Retail stock and display protection

Shelved stock, packaging and display units get fully sheeted or relocated to an unaffected part of the store before work starts nearby. Where stock can't move, we work at a distance that keeps overspray and dust well clear, using low-spread application methods rather than spray in tight retail spaces.

What we do if something is damaged

We photograph the condition of equipment and stock before starting in any room where damage risk exists, so there's a clear record either way. If something is affected despite protection, we report it immediately to the site contact rather than hoping it goes unnoticed — that's the only way trust survives a mistake.

  • Before-and-after photographs taken in equipment and stock areas
  • Any incident reported to the site contact on the same day, in writing

How we work on this

  • We seal vents, fans and cable entry points individually on any equipment left in a work area.
  • We photograph equipment and stock areas before starting work in rooms with genuine damage risk.
  • We report any incident to the site contact in writing on the same day it occurs.

Questions we are asked about this

Do you move IT equipment yourselves?

Only with explicit agreement — for anything networked or containing sensitive data, we prefer the client's own IT team handles the physical move, and we protect it in place until they do.

Can you spray paint near working computer equipment?

We avoid it. Spraying near live equipment with open vents is a real risk, so we switch to brush and roller application in those areas or ask for equipment to be powered down and sealed first.

What if stock can't be moved out of a retail unit at all?

We work in sections, fully sheeting the stock nearest the current work area and moving the sheeting with us as we progress, rather than sheeting the whole shop at once and working blind.

Walk us through your equipment and stock layout and we'll agree a protection plan before quoting.

Protecting IT and stock properly is a five-minute-per-item job that prevents an expensive one.

Start your project

Planning a commercial painting or decorating project?

Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.