Hampshire · SO14–SO19

Southampton marina structural coatings contractors

Structural steel around the Bitterne marina takes real abuse. We shot-blast, prime with a zinc-rich primer and topcoat in a marine-grade urethane — 10-year spec on properly prepared substrate.

Marina & boatyard coatings in Southampton — edwardian and inter-war housing in portswood and highfield

Comparable projects

  • MEWP-based quayside access
  • Tide and weather-window planning
  • Colour-matched to marina branding
  • 10-year film-life expectation on prepared substrate

Why the setting changes the work

Edwardian and inter-war housing in Portswood and Highfield, dockside high-rise apartments around Ocean Village and Centenary Quay, plus 1960s commercial stock on Above Bar.

Audience: Marina operators, boatyards and marine-industrial premises needing durable structural coatings.

How the job is sequenced

Colour matching to marina branding
10-year film-life specification on prepared substrate
Two-pack epoxy on structural steel
Marine-grade urethane topcoat on cladding
Shot-blast prep and zinc-rich primer on steel
Adhesion prep and modified urethane on cladding
Project reference for marina & boatyard coatings across SO14–SO19
Project lens

Send access, drawings or a few photos and we'll come back with a costed, staged plan.

The realistic working radius

Cruise-terminal traffic and the Itchen Bridge tolls shape our scheduling — early starts before peak make a real difference on city-centre jobs.

  • Shirley
  • Portswood
  • Bassett
  • Woolston
  • Bedford Place
  • Highfield

What the schedule plans around

01

Existing coating adhesion and salt contamination

02

Access — MEWP, scaffold or float

03

Tide and weather windows

04

Coating film-thickness specification

05

Environmental containment for shot-blast

What clients usually ask first

How is a marina & boatyard coatings project priced?

We price against a physical site walk-round rather than a rate card — access, condition and use always change the scope.

What preparation is included?

Preparation is the majority of the day on this brief — full sand-back, priming and any resin or filler repair before topcoat.

Which paint system do you use?

Shot-blast prep and zinc-rich primer on steel We share the product data sheet before mobilising.

How long does a typical marina & boatyard coatings job take?

Small projects run 2–4 days; larger programmes phase across 1–3 weeks depending on access and elevation count.

Related services in Southampton

Ready to plan the work?

Send access, drawings or a few photos and we'll come back with a costed, staged plan.

Book a site survey
Start your project

Planning a commercial painting or decorating project?

Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.