Hampshire · SO21–SO23

Winchester marina structural coatings contractors

Structural steel around the Hyde marina takes real abuse. We shot-blast, prime with a zinc-rich primer and topcoat in a marine-grade urethane — 10-year spec on properly prepared substrate.

Marina & boatyard coatings in Winchester — listed georgian and regency townhouses around the cathedral close

Comparable projects

  • Tide and weather-window planning
  • Colour-matched to marina branding
  • 10-year film-life expectation on prepared substrate
  • Regular marina and boatyard programmes on the South Coast

Why the setting changes the work

Listed Georgian and Regency townhouses around the Cathedral Close, flint-and-brick cottages in St Cross, plus modern executive estates around Badger Farm.

Audience: Marina operators, boatyards and marine-industrial premises needing durable structural coatings.

How the job is sequenced

Shot-blast prep and zinc-rich primer on steel
Adhesion prep and modified urethane on cladding
MEWP access for high-level quayside stock
Tide- and weather-window planning
Colour matching to marina branding
10-year film-life specification on prepared substrate
Project reference for marina & boatyard coatings across SO21–SO23
Project lens

Send access, drawings or a few photos and we'll come back with a costed, staged plan.

The realistic working radius

Pedestrianised High Street access windows are early-morning only — we coordinate with WCC for permit work and dust-screen any pavement frontage.

  • Hyde
  • Weeke
  • Stanmore
  • Twyford
  • Kings Worthy
  • Badger Farm

What the schedule plans around

01

Certified applicator requirements

02

Programme phasing around marina trade

03

Substrate — steel, Kingspan, block, timber

04

Existing coating adhesion and salt contamination

05

Access — MEWP, scaffold or float

What clients usually ask first

What preparation is included?

Preparation is the majority of the day on this brief — full sand-back, priming and any resin or filler repair before topcoat.

Which paint system do you use?

Shot-blast prep and zinc-rich primer on steel We share the product data sheet before mobilising.

How long does a typical marina & boatyard coatings job take?

Small projects run 2–4 days; larger programmes phase across 1–3 weeks depending on access and elevation count.

Do you provide a written quotation?

Yes — every quote is written, itemised by area or elevation, and covers preparation, materials, labour, access and clean-down.

Related services in Winchester

Ready to plan the work?

Send access, drawings or a few photos and we'll come back with a costed, staged plan.

Book a site survey
Start your project

Planning a commercial painting or decorating project?

Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.