Hampshire · PO7–PO8

Waterlooville marina structural coatings contractors

Structural steel around the Horndean marina takes real abuse. We shot-blast, prime with a zinc-rich primer and topcoat in a marine-grade urethane — 10-year spec on properly prepared substrate.

Marina & boatyard coatings in Waterlooville — predominantly post-war and modern estate housing

Comparable projects

  • MEWP-based quayside access
  • Tide and weather-window planning
  • Colour-matched to marina branding
  • 10-year film-life expectation on prepared substrate

Why the setting changes the work

Predominantly post-war and modern estate housing, Wellington Retail Park stock, and small light-industrial units around Hambledon Road.

Audience: Marina operators, boatyards and marine-industrial premises needing durable structural coatings.

How the job is sequenced

Colour matching to marina branding
10-year film-life specification on prepared substrate
Two-pack epoxy on structural steel
Marine-grade urethane topcoat on cladding
Shot-blast prep and zinc-rich primer on steel
Adhesion prep and modified urethane on cladding
Project reference for marina & boatyard coatings across PO7–PO8
Project lens

A short walk-round gives us the site facts we need to price this properly rather than round-average it.

The realistic working radius

Retail-park works run before 9am or after 6pm to suit footfall — landlord co-ordination is straightforward via park agents.

  • Denmead
  • Berewood
  • Lovedean
  • Clanfield
  • Purbrook
  • Widley

What the schedule plans around

01

Tide and weather windows

02

Coating film-thickness specification

03

Environmental containment for shot-blast

04

Certified applicator requirements

05

Programme phasing around marina trade

What clients usually ask first

How is a marina & boatyard coatings project priced?

We price against a physical site walk-round rather than a rate card — access, condition and use always change the scope.

What preparation is included?

Preparation is the majority of the day on this brief — full sand-back, priming and any resin or filler repair before topcoat.

Which paint system do you use?

Shot-blast prep and zinc-rich primer on steel We share the product data sheet before mobilising.

How long does a typical marina & boatyard coatings job take?

Small projects run 2–4 days; larger programmes phase across 1–3 weeks depending on access and elevation count.

Related services in Waterlooville

Ready to plan the work?

A short walk-round gives us the site facts we need to price this properly rather than round-average it.

Arrange a walk-round
Start your project

Planning a commercial painting or decorating project?

Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.