Matching equipment to the building, not the habit
A crew that defaults to whatever they used last week can end up fighting a building that was never suited to it. A low-headroom retail unit, a listed stairwell and a tall commercial atrium each want a different piece of kit, and getting that wrong shows up as slow progress, poor finish quality near the edges, or equipment simply not fitting through a doorway.


