What should a decorating quote include?
Two quotes for the same building can differ by thousands and both be honest, because they are pricing different amounts of work. A quote is only comparable when it says what is being prepared, what is going on, and what is not included.

01The items that should always be written down
If any of these are missing, ask. A contractor who will not put them in writing is leaving room to reduce the work later.
- Areas covered, room by room or zone by zone
- Preparation described, not just the word prepared
- Product names and finishes, with the number of coats
- Who moves and protects furniture, fittings and floors
- Access equipment: towers, scaffold or powered access, and who supplies it
- Start date, duration and working hours
- Exclusions, stated plainly
02Preparation is where quotes really differ
Sanding, filling, caulking, stain blocking, mould treatment and priming are the hours that make a finish last. A quote that says two coats of emulsion with no preparation detail is not the same job as one that lists it.
03Payment terms and what happens if scope changes
Expect stage payments on larger work rather than a large sum up front, and a written variation process so extra work is agreed and priced before it is done, not discovered on the final invoice.
04The commercial extras
On commercial and managed sites the quote should also reference insurance cover, RAMS, out-of-hours rates if relevant, and how snagging and handover will be run.
Common questions
Should a quote name the paint being used?
Yes. Product, finish and coat count should be stated, since those decide both the price and how long the work lasts.
Why are two quotes so far apart?
Usually preparation and coat counts. Compare those line by line before comparing totals.
Should I pay a deposit?
Materials deposits are normal on larger jobs. Paying most of the value up front is not.
What if extra work is found?
It should be quoted as a written variation and agreed before it is carried out.
Is a quote the same as an estimate?
No. A quote is a fixed price for a defined scope, whereas an estimate is an expectation that can move.
Should exclusions be listed?
Yes, and a clear exclusions list is a good sign rather than a bad one.
Related services
Read next
Next step
Ask us for a line-by-line quote you can put next to anyone else's.
Request a surveyPlanning a commercial painting or decorating project?
Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.