Dorset · BH23

Practical student accommodation repaint in Christchurch

For universities and MATs managing Christchurch halls, we coordinate directly with the estates team and work to their standard spec.

Student accommodation in Christchurch — georgian and regency townhouses around the priory

What we usually see at survey

Georgian and Regency townhouses around the Priory, Edwardian and inter-war seafront villas at Highcliffe and Mudeford, plus modern harbourside apartments at Stanpit and Bridge Street.

Audience: PBSA operators, university estates and student HMO landlords running summer turnaround.

Where else we work this week

Priory conservation area and Mudeford Quay need low-impact welfare setups; airport-perimeter business-park work requires pre-cleared BOH security access.

  • Highcliffe
  • Friars Cliff
  • Burton
  • Somerford
  • Stanpit
  • Hurn

Recent similar work

  • Portfolio pricing per bedroom or per block
  • Coordination with estates and inventory teams
  • Regular summer turnaround programmes on student stock
  • PBSA and university estate experience
Project reference for student accommodation across BH23
Project lens

A short walk-round gives us the site facts we need to price this properly rather than round-average it.

A working scope for this brief

Scuff-resistant emulsion on walls and communal
Water-based satin on doors, frames and skirting
Kitchen unit door touch-up in same visit
Bathroom anti-mould topcoat
Priced per bedroom, per flat or per block
Standard palette held for portfolio operators

The choices worth having on the table

01

Standard palette vs per-block colour choice

02

Communal-area durability spec

03

Kitchen touch-up scope

04

Bathroom anti-mould topcoat inclusion

05

Portfolio pricing per bedroom or per block

Answers we give at survey

What preparation is included?

Preparation is the majority of the day on this brief — full sand-back, priming and any resin or filler repair before topcoat.

Which paint system do you use?

Water-based satin on doors, frames and skirting We share the product data sheet before mobilising.

How long does a typical student accommodation job take?

Small projects run 2–4 days; larger programmes phase across 1–3 weeks depending on access and elevation count.

Do you provide a written quotation?

Yes — every quote is written, itemised by area or elevation, and covers preparation, materials, labour, access and clean-down.

Explore more of the site

The sensible next step

A short walk-round gives us the site facts we need to price this properly rather than round-average it.

Arrange a walk-round
Start your project

Planning a commercial painting or decorating project?

Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.