Sympathetic period repainting shaped around Gosport stock
The commonest failure mode we see on Gosport period repaints is impermeable modern paint applied over lime plaster or breathable render — it blisters within two years. A period-specific spec avoids that from day one.

The typical period-house brief locally
Coastal Edwardian and inter-war stock in Alverstoke and Lee, naval housing around Rowner, and exposed seafront frontages along Marine Parade.
Audience: Owners of pre-1940s properties needing sympathetic full or partial repainting.
Where else we work each week
Coastal salt-air conditions push us toward marine-grade primers and short weather windows — we plan exteriors around tide and wind forecasts.
- Alverstoke
- Hill Head
- Rowner
- Bridgemary
- Elson
- Lee-on-the-Solent
Recent heritage repaint work
- Comfortable running breathable specs over lime substrates
- Detail-protection experience on cornice, ceiling rose and panelling
- Colour-matched programmes to heritage palettes
- Multi-phase programmes so families stay in-house

Period projects hinge on substrate honesty and phasing. A single walk-round gives us both, and gives you a costed schedule to react to.
A period-first working scope
Practical decisions ahead of paint
Coordination with plasterers, joiners or electricians on wider refurb work
Whether the property is listed or in a conservation area
Substrate breathability — modern impermeable paints on lime cause blistering
Original mouldings and features worth reviving rather than overpainting
Phasing so owners can stay in-house through the works
Before we walk the house
Can you match a National Trust or Farrow & Ball palette?
Yes — we sample and match to Farrow & Ball, Little Greene, Edward Bulmer, Papers & Paints and Paint & Paper Library. Brush-out samples are provided before full application.
How long does a whole-house period repaint take?
A three-bed Victorian semi typically runs 3–4 weeks including preparation and touch-ups. Larger Edwardian and Georgian homes phase over 5–8 weeks depending on ceiling heights and detail.
Do you work on the outside as well?
Yes — we run the exterior joinery and render as a separate weather-window phase, usually April–October, and dovetail it with interior work rather than blocking the whole programme on weather.
What about lead paint on the woodwork?
Pre-1970s joinery often carries lead-bearing paint. We test suspect layers and follow HSE-compliant removal — no dry sanding without extraction and containment.
Explore more of the site
The sensible next step
Period projects hinge on substrate honesty and phasing. A single walk-round gives us both, and gives you a costed schedule to react to.
Plan your Gosport heritage repaintPlanning a commercial painting or decorating project?