Hampshire · PO14–PO17

Fixing new-build paintwork in Fareham within the defect period

For families moving into a new Fareham home, the sensible sequence is: unpack, list the rooms that bother you, and let us repaint them in trade emulsion over one or two visits rather than chasing individual touch-ups.

New-build snagging in Fareham — mix of 1980s–2000s commercial units at segensworth

The typical new-home brief here

Mix of 1980s–2000s commercial units at Segensworth, modern Whiteley village retail and apartments, plus Victorian terraces along West Street.

Audience: New-build owners and developers dealing with snagging paintwork within the two-year defect period.

Where we run snagging jobs weekly

Segensworth one-way system and Whiteley shared parking shape our deliveries — we book in via park management before mobilising.

  • Portchester
  • Titchfield
  • Segensworth
  • Locks Heath
  • Park Gate
  • Catisfield

Recent new-build repaints

  • Weekend / evening scheduling for occupied family homes
  • Careful floor protection over new engineered flooring and carpet
  • Regular new-build repaints on developments across the region
  • Confident cutting in around joinery and reveals without masking marks
Project reference for new-build snagging across PO14–PO17
Project lens

New-build paintwork usually needs specification, not defect-hunting. A short walk-round tells us which rooms need full repaint and which just need a cut-in fix.

A snagging-first scope

Optional scuff-resistant emulsion for hallways, stairs and children's rooms
Skirting, architrave and door frame recoat in water-based satin or eggshell
Filler shadow correction and mist-coat where developer stopped short
Wallpaper feature walls hung / removed as required
Radiator removal or masking where a proper cut-in matters
Room-by-room dust protection so life continues in the rest of the house

Points that change the price

01

Whether to repaint pre-move-in or once furniture is out of the boxes

02

Order of rooms so you keep one bedroom and one living space useable

03

Skirting and architrave — repaint in situ or take off for a factory finish

04

Whether wallpaper feature walls are wanted at the same visit

05

Radiator masking vs full removal for cleaner cut-in

Common developer-defect questions

Will you protect the new flooring?

Yes — full board and sheet protection over any engineered or LVT floor, and taped cardboard on carpet edges where trade traffic runs.

How long does a typical three-bed repaint take?

3–5 working days pre-move-in, 5–8 when furniture is in and rooms need to be worked around. Skirting and doors add 2 days depending on how many rooms.

Can you repaint the woodwork too?

Yes — we lightly key and recoat skirting, architrave and doors in a water-based satin or eggshell. It's the cheapest way to stop the yellowing that developer trim paint tends to show.

What about ceiling touch-ups?

New-build ceilings tend to flash badly — a full mist plus topcoat gives a clean finish. Spot touch-ups almost always show.

Explore more of the site

The sensible next step

New-build paintwork usually needs specification, not defect-hunting. A short walk-round tells us which rooms need full repaint and which just need a cut-in fix.

Arrange a room-by-room walk-round
Start your project

Planning a commercial painting or decorating project?

Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.