Hampshire · SO50–SO53

Marine-industrial repainting in Eastleigh

Weather and tide windows shape the scope. We plan quayside work around forecast and tide tables, and split the programme into achievable dry-weather sessions.

Marina & boatyard coatings in Eastleigh — edwardian railway-town housing in central eastleigh

What we usually see at survey

Edwardian railway-town housing in central Eastleigh, executive estates in Chandler's Ford, and modern logistics units on Wide Lane.

Audience: Marina operators, boatyards and marine-industrial premises needing durable structural coatings.

Where else we work this week

Airport-adjacent sites have airside-style security — DBS-checked operatives and timed deliveries are standard.

  • Bishopstoke
  • Fair Oak
  • Boorley Green
  • Botley
  • West End
  • Bursledon

Recent similar work

  • Colour-matched to marina branding
  • 10-year film-life expectation on prepared substrate
  • Regular marina and boatyard programmes on the South Coast
  • Two-pack epoxy and urethane specifications
Project reference for marina & boatyard coatings across SO50–SO53
Project lens

Send access, drawings or a few photos and we'll come back with a costed, staged plan.

A working scope for this brief

Shot-blast prep and zinc-rich primer on steel
Adhesion prep and modified urethane on cladding
MEWP access for high-level quayside stock
Tide- and weather-window planning
Colour matching to marina branding
10-year film-life specification on prepared substrate

The choices worth having on the table

01

Substrate — steel, Kingspan, block, timber

02

Existing coating adhesion and salt contamination

03

Access — MEWP, scaffold or float

04

Tide and weather windows

05

Coating film-thickness specification

Answers we give at survey

What preparation is included?

Preparation is the majority of the day on this brief — full sand-back, priming and any resin or filler repair before topcoat.

Which paint system do you use?

Shot-blast prep and zinc-rich primer on steel We share the product data sheet before mobilising.

How long does a typical marina & boatyard coatings job take?

Small projects run 2–4 days; larger programmes phase across 1–3 weeks depending on access and elevation count.

Do you provide a written quotation?

Yes — every quote is written, itemised by area or elevation, and covers preparation, materials, labour, access and clean-down.

Explore more of the site

The sensible next step

Send access, drawings or a few photos and we'll come back with a costed, staged plan.

Book a site survey
Start your project

Planning a commercial painting or decorating project?

Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.