Dorset · BH23

Boatyard and quayside coating programmes in Christchurch

Cladding on marina workshops in Christchurch tends to be Kingspan or profile-steel. We use a full adhesion prep sequence and a two-coat modified urethane, colour-matched to marina branding.

Marina & boatyard coatings in Christchurch — georgian and regency townhouses around the priory

Method statement, condensed

10-year film-life specification on prepared substrate
Two-pack epoxy on structural steel
Marine-grade urethane topcoat on cladding
Shot-blast prep and zinc-rich primer on steel
Adhesion prep and modified urethane on cladding
MEWP access for high-level quayside stock

Points that shape the price

01

Environmental containment for shot-blast

02

Certified applicator requirements

03

Programme phasing around marina trade

04

Substrate — steel, Kingspan, block, timber

05

Existing coating adhesion and salt contamination

How Christchurch shapes the specification

Georgian and Regency townhouses around the Priory, Edwardian and inter-war seafront villas at Highcliffe and Mudeford, plus modern harbourside apartments at Stanpit and Bridge Street.

Audience: Marina operators, boatyards and marine-industrial premises needing durable structural coatings.

Why this is familiar ground

  • Tide and weather-window planning
  • Colour-matched to marina branding
  • 10-year film-life expectation on prepared substrate
  • Regular marina and boatyard programmes on the South Coast
Project reference for marina & boatyard coatings across BH23
Project lens

The next useful step is a site visit — access, condition and use always change the scope in some way.

Around Christchurch and nearby

Priory conservation area and Mudeford Quay need low-impact welfare setups; airport-perimeter business-park work requires pre-cleared BOH security access.

  • Friars Cliff
  • Burton
  • Somerford
  • Stanpit
  • Hurn
  • Bransgore

Before we walk the site

What preparation is included?

Preparation is the majority of the day on this brief — full sand-back, priming and any resin or filler repair before topcoat.

Which paint system do you use?

Shot-blast prep and zinc-rich primer on steel We share the product data sheet before mobilising.

How long does a typical marina & boatyard coatings job take?

Small projects run 2–4 days; larger programmes phase across 1–3 weeks depending on access and elevation count.

Do you provide a written quotation?

Yes — every quote is written, itemised by area or elevation, and covers preparation, materials, labour, access and clean-down.

Compare nearby coverage

Move the project forward

The next useful step is a site visit — access, condition and use always change the scope in some way.

Request a project quote
Start your project

Planning a commercial painting or decorating project?

Speak to a Hampshire commercial decorating contractor that turns up, communicates clearly and delivers a finish that lasts.